CCC Donkers

Within a time frame of 6 months, a complete new farm, including a spacious
sorting hall, was constructed to replace the old farm. The farm now comprises 8
units, each of which measures 1613 m2. The company is able to adapt quickly to
the varying demand from the market, thanks to a sorting installation that can
sort the produce according to 9 different grades. Here also, one of the two cooling
machines was designed with heat recovery. If necessary, the required heat is
supplemented by the boiler.